Gongyi Xinqi Polymer Co., Ltd.ANIONIC POLYELECTROLYTEPROCESS WINDOW DESK
−BRIDGE
SETTLE
RECOVER
+86 199 3767 3999
Application and separator acceptance

Buying Anionic Polyelectrolyte for Manufactured-Sand Fines

Assess anionic polyelectrolyte for manufactured-sand wash-water fines by crusher feed, recycle quality, underflow handling and production throughput.

Gongyi Xinqi Polymer Co., Ltd.
Aggregate washing screens, slurry pipes and water-recycling equipment
01

Define the purchase decision

Manufactured-sand washing returns freshly generated mineral fines to a recirculating water system. A purchase decision should follow the washing and sludge-handling duty, not only a rapid settling result from a convenient clean-water sample.

Keep the proposed product identity connected to the tested suspension and the intended separator.

02

Describe the production campaign

Record rock source, crusher or screening changes, wash-water flow, fines and any clay contamination. Keep candidate tests tied to the material actually being processed. Particle distribution can change even when the headline tonnes-per-hour figure remains similar.

The aggregate wash-water record provides the circuit baseline.

03

Link grade to contact conditions

Compare adjacent molecular and anionic profiles using actual recycle water. Record injection, dilution and pumps between conditioning and settling. High local stock concentration can treat only a fraction of the flow and imitate a grade mismatch.

Use the contact and dilution method when a feedwell is part of the installation.

04

Retain useful production outputs

Track clarified-water fines, makeup requirement, underflow concentration and withdrawal stability. Include downstream dewatering if it limits throughput. A compact bed is useful only if the plant can discharge and handle it at the required rate.

Do not count production improvements caused by a changed crusher feed or reduced loading as a benefit of the new polymer.

05

Check a misleading apparent improvement

If washing throughput improves after both rock source and polymer change, use a controlled comparison before assigning the gain to the powder. Retain the feed campaign and recycle record with each result. Otherwise procurement risks paying for an apparent benefit created by a less difficult production feed.

Retain the comparison conditions and any unresolved acceptance requirement with the proposed purchase.

06

Set the release boundary

Keep the approved rock-feed and recycle-water envelope with the order. A major source or wash configuration change should prompt confirmation before the same consumption forecast is extended.

Purchase requirementRequired evidenceRelease condition
CampaignRock and fines historyTest represents current production
ContactDilution and injection checkCandidate reaches the suspended solids
ValueWater quality and solids withdrawalPurchase supports the complete circuit
07

Send a focused commercial request

Provide rock sources, campaign variation, process-water measurements, thickener arrangement and underflow limits. Include measured consumption and commercial delivery needs.

Include quantity, package and destination with the sample and RFQ record. Review quality and supply controls with Gongyi Xinqi Polymer Co., Ltd.; confirm grade-specific terms and availability before ordering.

Request a product and supply review

Send the suspension, treatment route and proposed purchasing scope.

WhatsAppEmail